Installing Our New 240V/Level 2 Voltec Charge Station (Phase II)
This is a follow-up to my previous post, Chevy Volt Metered Charging (Phase I). In the first phase, I ran a new dedicated circuit from the subpanel in my garage to the opposite wall to connect a 120V charging station. In this phase, I removed the existing receptacle, rewired for 240V, installed the Voltec Level 2 charging station, and wired the kWh meter inline. It’s not my intent to write a full set of instructions for installation here. The purpose of this post is to illustrate some of the installation steps with real-world pictures, which are somewhat hard to come by online (the pictures are rather small, but you can click on any of them for a larger version). As … Continue reading