Chevy Volt Metered Charging (Phase I)

Chevy Volt 120V Charger Mounted on the Wall

My wife and I recently brought home a brand new Chevy Volt (named “Sparky“), the plug-in electric hybrid vehicle (PHEV) from Chevrolet.  It’s a really cool car, and you can read about our first experiences with it here. Of course, the whole point point behind a PHEV is the actual plugging in.  The Volt comes with a 120V charger that plugs into your average 15A receptacle, and can fully charge the car in about 10 hours. Chevrolet’s charging station partner, SPX, sells a variety of Level 2 charging stations compatible with the Volt (and most plug-in electric vehicles, including the Nissan Leaf).  The Level 2 charging stations use 240V, and can charge the Volt in about 4 hours.  We’re going to be … Continue reading

Stupid, Angering Garage Door Opener Project

“An automatic garage door opener makes you feel like you’re working in a futuristic wonderworld”.  – Frank Ormand, Pretzel Magnate With the purchase of Amanda’s new Volt, I had to get the garage ready for a permanent resident.  She had kept her old Saab in the driveway, so I pretty much had the run of the place until now.  Protection from the elements aside, the garage is just a logical place to stick an electric car whilst it’s charging. And my father raised me on automatic garage door openers, so I figured installing one would be the right thing to do. Here’s a before picture of the garage: Nothing to laugh at, I suppose.  But the stupid door would just … Continue reading

Garage Subpanel with EMT

I have a 1 car attached garage (about 25×12) that I’ve been using for various projects. I’ve been wanting to upgrade the electrical since I moved in about 7 months ago, and I figured I’d do it in EMT. It’s rather stupid because the wall I’m installing most of the conduit on is adjacent to the house — however it’s framed separately, and there is a ~2″ gap between the back of the framing and the side of the house. It would make a perfect wiring chase for NM-B, making the job a hell of a lot cheaper and easier. But I wanted EMT because, well, for fun. It looks cool too. This is the first project I’ve ever piped … Continue reading

Basement Update

We’ve been in the house for about 3 months, and I’ve made some progress in the basement. Here are a few pictures just for posterity: The server rack (well, shelving unit) isn’t pretty, but it gets the job done.  I’m not exactly the computer version of Scrooge McDuck over here, so I stick with desktops.  The UPS on the right is a real old beater — I’ve replaced the batteries 3 times so far.  It’s a nice double-conversion full sine wave model, so I keep it around.   My workstation setup.  My primary machine needs upgrading badly:  A Dell GX280, P4 3.0Ghz, 3GB RAM.  It works for now.  All the monitors are hooked up to something or other, but I … Continue reading